OnlineManual
[
top
] [
new
|
list
|
search
|
recent
|
help
]
バックアップ一覧
差分
を表示
現在との差分
を表示
ソース
を表示
AQB340
へ行く。
1 (2011-05-27 (金) 16:12:03)
2 (2012-06-16 (土) 11:53:05)
3 (2012-06-22 (金) 18:22:47)
4 (2012-06-26 (火) 11:55:17)
ItemCost download
†
BOM control
ItemCost download
The contents of ItemCost corresponding to specified Query article Piece are outputted to a CSV file.
Input item name
Number of bits
Explanation
Plant code
-
Effective date
-
Cost type
-
The type of Cost which downloads is specified.
↑
†
Download of ItemCost
When downloading Cost information of Item, 【ItemCost download】 is started, required Item is inputted into 抽出条 PieceItem, and a 〔output〕 button is pushed.
※The outputted CSV file is outputted to 【
Report management
】 of 『
Operation control
』
Refer to the 「
Operation control
」 for 【
Report management
】 of 『
Operation control
』