Production plan generation †
- Production plan
- Japanese another Production plan of Plant specified in the pictures is newly created.
Query item name | Number of bits | Explanation |
---|
Plant | - | |
Last enforcement Period | - | 表示のみ |
Last determination period | - | 表示のみ |
Last period | - | 表示のみ |
Current determination period | - | TOのみ入力可能 |
Current generation period | - | 表示のみ |
Creation of Production plan †
- Production plan newly In the Generation case. 【Production plan generation 】 is started and specification and the 〔Production plan generation 〕 button are click(ed) for Complete date of Confirm Year/month this time.
※Period specified by the Current determination period:Last determination period+1-system parameter (standard calendar operation Day base)
※A Month number of standard calendar Last operation Day specified by the Current generation period:Last determination period+1-system parameter
- Processing result in which a GenerationBatch program starts Production plan can do Confirm of a log on 【job management】 screen of 『Operation control』.
Please Reference 「Chapter 12 Operation control」 about operation of 【job management】.
- In addition, on this screen, Production plan regeneration of Confirm Completed Period cannot be performed.
When re-creation needs to be performed, please carry out on the 【Production planList】 screen 】.