In Process control, based on the result of MRP, it ProcessExpand(s) based on Processmaster, Release of a Manufacture order is performed, and Work instruction sheet is outputted. To work instructions, Yield report is performed by every Manufacture order, Process or Item, and either for every Work center, and progress management is performed. LoadStatus is Confirm(ed) for every Work center, Change of a Production schedule, Change of Work center, etc. are performed, and Load leveling is performed.
- About Progress Status Progress Status is expressed as the following status.
Turn Status Progress Status 1 P:Plan The Plan order after MRP execute 2 O:Confirm Order created by Production planConfirm processing (only Forecast production) 3 Release Not start after Production order release. It creates like Day of Process by Release processing, and performs Release for work instructions. 4 Start It is Not Complete although Yield report. 5 Complete ManufactureComplete or Terminate
The progress Status of the Manufacture order of status after R:Release is set up by the progress Status of Process.
Status of a Manufacture order Status of Process Release The status of all the Process(es) is Release. Start The status of all the Process(es) is not Release or Complete. Complete The status of all the Process(es) is Complete. - About Yield report
A setting can do in Processmaster Process which performs Yield report.
it regards and comes out at the time of Yield report of back Process, and Process of Yield reportNeedlessness is Entr(ied)
【Example】
Process Qualified qty. Defective qty. Yield report 010 10 0 Needlessness 020 10 0 Needlessness 030 8 2 Required - About a Track record man day
Only Process of Yield reportRequired inputs a man day from a screen. Process of Yield reportNeedlessness is Entr(ied) by "Standard work unit × Yield number (Qualified qty.+Defective qty.)", Entr(ies) a man day collectively to Process of Yield reportRequired, or sets it up with a parameter at the time of introduction. It is possible to input only a man day, without inputting a Yield number.
- About the Storing processing at the time of Yield report It is considered as the number which Complete(d) Qualified qty. of LastProcess, and Storing processing is performed. Location of the Storing point turns into Location which Entr(ied) to Item ordermaster.
- When Picking(ing) by Picking report
Before performing Picking processing of Sub-item, Yield report can be performed, but please be sure to perform Pickingreport.- When Picking(ing) with backflash
When Yield of the following is Entr(ied), Picking processing of Sub-item is performed.
①When Qualified qty. of LastProcess is Entr(ied)
②When Defective qty. is Entr(ied) by each Process
Function(major division) | Function(inside classification) | Function(small classification) | FunctionExplanation |
---|---|---|---|
Production order release | Production order release(Screen) | Reference | The Manufacture order is indicated by List. |
Release | ・Perform Release of a Manufacture order about MRPProcessing result. ・Set to Object the order which carried out Selection, or the order acquired on Query conditions. ・Perform ProcessExpand for Processing result of MRP to Object, and perform Release of a Manufacture order. ・About Release(d) Object, Work instruction sheet of 1sheet is outputted for every Process the whole Manufacture order. For the output to 20Process, when large, a Revision page is performed to 1sheet. | ||
Re-print | ・About Selection(ed) Object, Work instruction sheet of 1sheet is outputted for every Process the whole Manufacture order. For the output to 20Process, when large, a Revision page is performed to 1sheet. | ||
Delete | Delete processing is performed about the Manufacture order before start. | ||
CSV output | The Manufacture order corresponding to Query conditions is outputted by CSV. | ||
Production order release(Batch) | Release | ・Start as succession processing of MRPBatch processing and acquire ReleaseObject in the year/month/date range of Plant of the MRP real rifling Piece, and extraction conditions. ・About acquired Object, perform ProcessExpand, determine Start date or Delivery date for every Process, and perform Release of a Manufacture order. | |
Manufacture order Entry | Add ・Update | AddEntry of a Manufacture order and Update are performed. When AddEntry(ing), Work instruction sheet is Release(d). | |
Work instruction sheet release | Work instruction sheet release(Batch) | Output | ・Succession processing of MRPBatch processing. ・In the year/month/date range of Plant of the MRP real rifling Piece, and extraction conditions after Production order release, About Work instruction sheet releaseObject, Work instruction sheet of 1sheet is outputted for every Process the whole Manufacture order. ・For the output to 20Process, when large, a Revision page is performed to 1sheet. |
Manufacture progress Confirm | Work center another Manufacture order Reference | Reference | Work center is specified and following Reference is performed for every Process the whole Manufacture order. ・Reference of task progress. ・Reference of Qualified qty. and non-Qualified qty. |
YieldEntry | ・Make Entry of Quantity (Process meter) of good Item / poor Item, or correction about ManufactureProcess of Yield reportRequired. ・Process of Yield reportNeedlessness Entr(ies) Yield by Yield report and the value of back Process. ・Even if Complete(d) or closed, QuantityChange of good Item / poor Item is possible. ・Entry or correction by Quantity of more good Item than Order qty. and poor Item is possible. | ||
Process termination | ・Perform Terminate processing for every Manufacture order / Process about the Manufacture order ReleaseCompleted(ed) or started. ・Closing, even if the remainder of Order remains is possible. | ||
Yield return | Track record of Yield is Return(ed) for every Manufacture order / Process. | ||
CSV output | The Manufacture order corresponding to Query conditions is outputted by CSV. | ||
Production schedule inquiry | Reference | The Production schedule of the Manufacture order of Plan-ReleaseStatus is displayed. | |
Production order list | Reference | Release of a Manufacture order or subsequent ones The progress Status of a Manufacture order is displayed on Object for every Process. | |
Production order termination | When the specified Manufacture order is Release or Start Completed, it can Terminate about the Manufacture order (status is made closing). | ||
Yield report | Yield report(Manufacture order No ) | Report | ・Perform YieldEntry by the Manufacture order No and Process. ・Entry Quantity of good Item / poor Item about ManufactureProcess of Yield reportRequired. ・About Process of Yield reportNeedlessness, Yield is Entr(ied) by Yield report and the value of back Process. ・Closing, even if the remainder of Order remains is possible. |
Yield report(Item) | Report | ・Entry Yield to the Manufacture order of old start by Work center-Item. ・Order qty. sets automatically to Complete the Manufacture order which became equal to the sum of Qualified qty. and non-Qualified qty. ・About Process of Yield reportNeedlessness, Yield is Entr(ied) as Qualified qty. of the Process concerned for Qualified qty.+Defective qty. Entr(ied) by Yield report of the following Process. ・Entry is performed in old order and Entry or correction according to Quantity of more good Item than Order qty. and poor Item only to a LastManufacture order is possible.。 | |
Yield reportBatch entry | Batch entry | ・Read-in is performed for the CSV file of specified YieldTrack record, and Batch entry is carried out. | |
ManufactureTrack recordReference | Process another YieldReference | Reference | ManufactureTrack record and ReceptionTrack record of Process outsource are Reference(d) to Report Unit. |
Rework instruction sheet release | ・In order to direct Repair, re-Work instruction sheet is outputted to PDF about Quantity judged that Repair is required by Yield. ・Only Process which Repair directs is outputted. | ||
CSV output | The Manufacture order corresponding to Query conditions is outputted by CSV. | ||
OperatorMaster table management | OperatormasterList | AddUpdate | information of ManufactureOperator is AddEntr(ied). |
informationUpdate | The existing Operatorinformation is edited. | ||
informationDelete | The existing Operatorinformation is Delete(d). | ||
Load accumulation | Work center another CapabilityList | Reference | The definition information of Work center another Capability is Reference(d) by List. |
Work center another CapabilityMaintenance | Add ・Update | Work center another Capability is Entr(ied). | |
Work center another LoadReference | Reference | Work center another LoadStatus is displayed. |