Work centermastermaintenance †
information about Basicinformation(s), such as Name of Work center, and Capability is setting.
Moreover, control of the Release existence of work instructions is also set up here.
Query item name | Number of bits | Explanation |
---|
Work center code | - | It is Input Mandatory at the time of Query of Entry Completed data. |
Input item name | Number of bits | Explanation |
---|
Plant code | - | Plant which has jurisdiction over Work center |
Work center code | 6 | |
Work center name | 40 | Name to Work center code |
Work center abbreviation | 20 | Abbreviated name |
Man-machine classification | - | |
Daily working hours | 12,2 | It is Valid to a double figures a small number of part. |
Working hours unit | - | Standard Working hours unit which is Setup value is displayed. |
Number of persons | 12,2 | Number of persons which Subordinate(s) to Work center |
Number | 12,2 | |
Standard man capability | - | 表示項目。1日当たり稼動工数×人員数×(稼動/100)×(出勤率/100) |
Standard machine capability | - | 表示項目。1日当たり稼動工数×台数×(稼動/100)×(出勤率/100) |
Standard quantity capability | 12,2 | |
Standard weight capability | 12,2 | |
Operating ratio | 12,2 | It is Valid to a double figures a small number of part. |
Attendance rate | 12,2 | It is Valid to a double figures a small number of part. |
Digestibility | 12,2 | It is Valid to a double figures a small number of part. |
Preparation time (H) | 12,2 | The preparation (plan) time before starting work is specified. |
Department type | - | 1: Processing, 2:Assembly, A : Inspection Either is Specified. |
Calendar ID | - | Calendar type applied to Work center is specified. It is necessary to create Calendar type and a calendar beforehand. |
Production instruction release classification | - | The existence of Release of work instructions is controlled. |
Loading type | - | It is used in accumulation and Leveling Function.(Fixation LT) performs ProcessExpand by Fixation Lead time. ・Infinite accumulation (Fixation LT):The pile only in consideration of work Load is carried out. ・Infinite accumulation :Accumulation only in consideration of work Load is carried out. ・Limited accumulation:Accumulation in consideration of Capability and Work Load is carried out. |
Add of Work center †
- The Add screen of AddWork center is displayed immediately after starting of 【Work centermastermaintenance】.
Necessary information is inputted and the 〔Add〕 button is click(ed).
Automatic calculation of Standard man capability †
- If the 〔Automatic calculation〕 button of Standard man capabilityItem is click(ed), The Caculate result of Number of persons × Daily working hours is set to Standard man capability.
Automatic calculation of Standard machine capability †
- If the 〔Automatic calculation〕 button of Standard machine capabilityItem is click(ed), The Caculate result of Number × Daily working hours is set to Standard machine capability.